(1)GB 50316《工業金(jin)屬管道設(she)計規范》對焊后熱處理的規定(ding)。


   ①. 碳鋼管道壁厚大于(yu)或(huo)等于(yu)19mm時應進行(xing)焊后熱處理(li)。


   ②. 管(guan)道(dao)焊后(hou)需要熱(re)處理的(de)(de)厚度(du)及(ji)要求除按GB 50316的(de)(de)規(gui)定(ding)外還應(ying)符合GB 50235《現場設備、工(gong)(gong)(gong)(gong)(gong)業管(guan)道(dao)焊接工(gong)(gong)(gong)(gong)(gong)程(cheng)施工(gong)(gong)(gong)(gong)(gong)規(gui)范(fan)》,GB 50184《工(gong)(gong)(gong)(gong)(gong)業金屬管(guan)道(dao)工(gong)(gong)(gong)(gong)(gong)程(cheng)施工(gong)(gong)(gong)(gong)(gong)質量驗(yan)收規(gui)范(fan)》的(de)(de)規(gui)定(ding)。


   ③. 當15CrMo材料含碳量高于0.15%時,任何(he)壁厚均宜進行焊后熱(re)處(chu)理。


   ④. 當管(guan)(guan)子或管(guan)(guan)件(jian)采用焊接(jie)連接(jie)時,推薦的(de)(de)預熱和熱處理要求所采用的(de)(de)厚度,應是連接(jie)接(jie)頭處的(de)(de)較厚的(de)(de)壁厚。但GB 50316也列了(le)除外(wai)情況。


   ⑤. 鋼管彎曲后(hou)的(de)熱處理除符(fu)合GB50316的(de)規(gui)定外(wai),還應符(fu)合GB50235《工業金屬管道(dao)工程施工及驗收(shou)規(gui)范》的(de)規(gui)定。


(2)SY/T 0011《天(tian)然氣凈化處(chu)理(li)廠設計(ji)規范》的(de)6.3.10條(tiao)規定“在(zai)酸性環境中(zhong)使用的(de)碳鋼(gang)管(guan)道及設備應進(jin)行焊后熱(re)處(chu)理(li)”。


(3)SY 4209《石油天(tian)然氣(qi)建(jian)設(she)工(gong)(gong)程(cheng)施(shi)工(gong)(gong)質量驗收(shou)規(gui)范 天(tian)然氣(qi)凈化處理(li)廠工(gong)(gong)程(cheng)》中說明含量>5%的(de)焊縫(feng)熱處理(li)后要(yao)進行硬度檢查。未(wei)明確(que)(que)<5%的(de)情況,未(wei)明確(que)(que)熱處理(li)工(gong)(gong)藝要(yao)求。


(4)GB 50236《現場設備、工(gong)(gong)業管道焊接工(gong)(gong)程施工(gong)(gong)規(gui)范》中僅對壁厚大于30mm的有溫(wen)度要求(qiu),而薄壁管未(wei)有要求(qiu)及做法。